|
|
|
Christophe Sauvey and Nathalie Sauer
Since its creation by Nawaz, Enscore, and Ham in 1983, NEH remains the best heuristic method to solve flowshop scheduling problems. In the large body of literature dealing with the application of this heuristic, it can be clearly noted that results diffe...
ver más
|
|
|
|
|
|
|
Nesrine Touafek, Fatima Benbouzid-Si Tayeb and Asma Ladj
In the last decades, the availability constraint as well as learning and deteriorating effects were introduced into the production scheduling theory to simulate real-world case studies and to overcome the limitation of the classical models. To the best o...
ver más
|
|
|
|
|
|
|
Mingming Xu, Shuning Zhang and Guanlong Deng
When no-wait constraint holds in job shops, a job has to be processed with no waiting time from the first to the last operation, and the start time of a job is greatly restricted. Using key elements of the iterated greedy algorithm, this paper proposes a...
ver más
|
|
|
|
|
|
|
Tomasz Kowalik and Andrzej Walega
This paper investigates a possibility of using asymptotic functions to determine the value of curve number (CN) parameter as a function of rainfall in small agricultural watersheds. It also compares the actually calculated CN with its values provided in ...
ver más
|
|
|
|
|
|
|
Miriam A. Kolar, Doyuen Ko and Sungyoung Kim
We examine the praxis implications of our working definition of aural heritage: spatial acoustics as physically experienced by humans in cultural contexts; aligned with the aims of anthropological archaeology (the study of human life from materials). Her...
ver más
|
|
|
|