Ratna S Alifen     Pág. pp. 103 - 113
A project network is composed of various activities interrelated in a sequencial relationship. If delay occurs on one activity, it will eventually cause the project overall duration to delay. To anticipate the project delays one could accelarate the su... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
Mehran Vahedi Nikbakht, Mohammad Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, Reza Moezzi and Amir Vadiee    
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) a... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Hubert Anysz, Jerzy Roslon and Andrzej Foremny    
There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but th... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Murat Çevikbas and Zeynep Isik    
Numerous studies have been conducted by researchers on the delay analysis topic, which is one of the primary areas of scientific study due to the effects of delays on time and cost in construction projects. Following fruitful contributions made by the re... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Ludwig Rivera, Hilario Baguec, Jr. and Chunho Yeom    
Delays in road construction projects due to various reasons are a major problem facing construction professionals. The incapability of finishing projects punctually and within a given budget is a persistent issue worldwide. This study aims to determine t... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Ashem Emmanuel Egila,Oluwaseun Abdulakeem Balogun,Saheed Olanrewaju Yusuf     Pág. 1184 - 1200
Revista: Independent Journal of Management & Production    Formato: Electrónico

 
en línea
tri sutrisno     Pág. 73 - 79
ABSTRACTService providers involved in a project generally expect the project to be carried out to run smoothly, the evaluation of risk factors for project delay is necessary. This study departs from the formulation of the problem are How to rank (factors... ver más
Revista: Journal of Civil Engineering; Building and Trasportation    Formato: Electrónico

 
en línea
Khalid K. Naji, Murat Gunduz and Mohamed Adalbi    
Fast-track construction has recently become the prevailing construction approach globally. It enables owners and developers to make rapid returns on investment through shortened construction periods. This strategy has many effects on the industry; theref... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Andi A.,Lalitan D.,Loanata V.R.     Pág. 8 - 17
A construction project comprises of a number of work packages, which are subjected to delays. These delays may be caused by many on-site factors. The aim of this research is to represent owner and contractors perceptions towards delay factors that freque... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
There have been many studies done on the causes of delay on construction projects and building projects all around the world. They use different methods, on different geographical areas, and they come up with different results. There are, however, few st... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Budiman Proboyo     Pág. pp. 46 - 58
Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both pa... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
Isaac Bonaparte, Nathan Austin, Ephraim Okoro    
Following delays in the production of the companys annual accounts, the Chief Executive Officer is livid. He summons the Chief Financial Officer to explain circumstances surrounding the delay. The Chief Financial Officer, after consultation with the Dire... ver más
Revista: Journal of Business Case Studies (JBCS)    Formato: Electrónico

 
en línea
Lin Yang, Xinran Hu and Xianbo Zhao    
In response to frequent complex project delays, organization synchronization, a set of interactions, is a dynamic behavior that helps to restore the stability of complex projects after delays. However, few studies have figured out how organizations synch... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Ayodeji Olatunji Aiyetan and Dillip Kumar Das    
Infrastructure project delivery, specifically the delivery of water infrastructure projects, is a serious challenge in South Africa. Therefore, using the study context of water utility agencies in South Africa, the objective of this study was to examine ... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Chengyi Zhang and David Arditi    
Effective progress control is vital for steering infrastructure construction to completion with minimum delay. Walking through the infrastructure project site to record progress in different activities is time-consuming, requiring information extracted f... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Muhammad Yaseen,Aida Mustapha,Noraini Ibrahim    
Many of the organizations often fail to deliver big size software projects in allocated time and budget. One of the main reason of exceed in time estimation is improper implementation of requirements and their integration as software requirements are int... ver más

 
en línea
Baderisham Jolly,Filzah Md Isa,Siti Norezam Othman,Muhd Afiq Syazwan Ahmdon     Pág. 142 - 148
Many construction projects in Malaysia experience a reducing performance. There are many factors affecting the performance of construction projects such as poor site management, inadequate planning, ineffective marketing efforts, etc. which usually lead ... ver más
Revista: International Review of Management and Marketing    Formato: Electrónico

 
en línea
G. G. Md. Nawaz Ali, Mohammad Nazmus Sadat, Md Suruz Miah, Sameer Ahmed Sharief and Yun Wang    
Recently, the Third Generation Partnership Project (3GPP) introduced new radio (NR) technology for vehicle-to-everything (V2X) communication to enable delay-sensitive and bandwidth-hungry applications in vehicular communication. The NR system is strategi... ver más
Revista: Future Internet    Formato: Electrónico

 
en línea
Kanghee Park and Boyoung Kim    
Within a construction project, the clients are categorized as private individuals, private companies, public institutions, etc. In this research, the private client is identified as a non-professional individual building owner and is involved in making d... ver más
Revista: Administrative Sciences    Formato: Electrónico

 
en línea
Guido Saccone and Marco Marini    
In the framework of the ?Multidisciplinary Optimization and Regulations for Low-boom and Environmentally Sustainable Supersonic aviation? project, pursued by a consortium of European government and academic institutions, coordinated by Politecnico di Tor... ver más
Revista: Aerospace    Formato: Electrónico