2   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Damir Karabaic, Marko Kr?ulja, Sven Maricic and Lovro Liveric    
The most commonly used subsea pipeline installation method is the S-Lay method. A very important and complex task in an S-Lay installation engineering analysis is to find the optimal pipelay vessel installation configuration for every distinctive pipelin... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

 
en línea
Dalibor Peru?ko, Damir Karabaic, Ivan Bajsic and Jo?e Kutin    
During LNG storage and transportation by ship, a fraction of the LNG in the cryogenic tanks evaporates due to heat ingress through the insulation, resulting in boil-off gas (BOG) production and a change in LNG composition, a phenomenon known as LNG agein... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »