2   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Kevin McLain, Douglas D. Gransberg, Micheal C. Loulakis     Pág. 1 - 19
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing g... ver más

 
en línea
Kevin McLain, Douglas D. Gransberg, Micheal C. Loulakis     Pág. 1 - 19
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing g... ver más
Revista: Construction Economics and Building    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »