Sopian Tamba,Deni Maisandi Hutauruk
Pág. 34 - 41
Penjadwalan ulang ini dilakukan menggunakan program komputer microsoft project untuk mendapat kan hasil yang lebih efisien dan efektif, Dengan durasi yang optimal. Dalam penjadwalan proyek ini menggunakan metode jaringan kerja PDM (precedence diagr...
ver más
|
|
|
|
|
|
|
Andi Andi,Dwi Djendoko
Pág. pp. 80 - 87
The role of worker motivation is very important in improving construction productivity. In order to increase the motivation, it is essential for management to understand needs of the workers as well as factors motivating and demotivating. This paper aims...
ver más
|
|
|
|
|
|
|
Andreas Wibowo
Pág. pp. 1 - 8
Program Evaluation Review Technique %28PERT%29 is a scheduling method that consider the uncertainty of the duration of an activity. It assumes a probability density function with a beta distribution. PERT simplifies the analysis using specific values of ...
ver más
|
|
|
|
|
|
|
Harry Patmadjaja
Pág. pp. 1 - 7
This research is a study on certain bidding strategy models, based on the maximum expected profit, as often used in developed countries. The models chosen for this research are: the Friedman model, the Gates model and the Ackoff & Sasieni model. Probabil...
ver más
|
|
|
|
|
|
|
Indriani Santoso
Pág. pp. 40 - 45
This research studied the occurrence of cost overruns in several type of construction projects, the causes of cost overruns, the dependency between cost overruns and projects type, cost overruns and time overruns, the causes of cost overruns and proje...
ver más
|
|
|
|
|
|
|
Nasyiin Faqih, Adam Bagus Prabowo
Pág. 151 - 155
Bandara Udara Internasional Sultan Hasanuddin melakukan pengembangan pembuatan Fly Over menuju ke lokasi area parkir Bandara Internasional Sultan Hasanuddin. Dengan adanya perkembangan pembuatan Fly Over ini dapat menimbulkan adanya potensi bahaya kerja....
ver más
|
|
|
|
|
|
|
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa
Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe...
ver más
|
|
|
|
|
|
|
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa
Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe...
ver más
|
|
|
|
|
|
|
Ermiyati Ermiyati,Fakhri Fakhri,Citra Hockiana
Pág. 69 - 82
The implementation of construction activities, especially building construction work, has a high risk of accidents because each stage of the work contains many potential hazards that can be detrimental. This study aims to determine the highest occupation...
ver más
|
|
|
|
|
|
|
Ermiyati Ermiyati,Fakhri Fakhri,Citra Hockiana
Pág. 69 - 82
The implementation of construction activities, especially building construction work, has a high risk of accidents because each stage of the work contains many potential hazards that can be detrimental. This study aims to determine the highest occupation...
ver más
|
|
|
|
|
|
|
Lendra Lendra
Pág. pp. 55 - 62
Kemitraan merupakan salah satu solusi manajemen untuk meningkatkan kinerja dan mempererat hubungan antar partisipan dalam proyek konstruksi. Penelitian ini bertujuan untuk mengukur tingkat kepercayaan dan membahas kepercayaan sebagai salah satu faktor su...
ver más
|
|
|
|
|
|
|
Suryanto Intan,Ratna S Alifen,Lie S Arijanto
Pág. pp. 36 - 45
Waste material is a crucial problem in building construction. By minimizing waste materials, contractors can increase their profit and minimize the environmental impacts. This research is conducted to obtain the quantities of construction waste material...
ver más
|
|
|
|
|
|
|
Budiman Proboyo
Pág. pp. 46 - 58
Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both pa...
ver más
|
|
|
|
|
|
|
Gideon Hadi Kusuma,Ferryanto S.G.,Dedy Cahyono H
Pág. pp. 59 - 64
There are two major problems in producing concrete spun piles. First is the concrete strength and second is the uniformity of the cross section. Due to spinning, most concrete spun piles cross section consist of two layers. The inner part which is morta...
ver más
|
|
|
|
|
|
|
Dwi Cahyo Krisnawan
Pág. 80 - 84
AbstrakSetiap pengembangan proyek memerlukan analisis anggaran pembangunan, analisis anggaran biaya sangat diperlukan karena dalam kenyataannya keberhasilan suatu proyek ditentukan oleh analisis biaya. Analisis anggaran biaya konstruksi gedung pascasarja...
ver más
|
|
|
|
|
|
|
Choiriza Tami Fadhilah,amsuardiman amsuardiman
Pág. 1 - 11
Program aplikasi komputer dewasa ini sangat mempermudah para manajemen rekayasa konstruksi dalam memasukkan data, mengelola aktivitas, laporan maupun pengontrolan aktivitas kegiatan proyek. Tujuan untuk mengetahui apakah schedule rencana sesuai dengan sc...
ver más
|
|
|
|
|
|
|
Herry Pintardi Chandra
Pág. pp. 109 - 112
Abstract in Bahasa Indonesia : Catatan redaksi%3A%0D%0A%0D%0APengendalian biaya adalah suatu aspek yang sangat penting dalam manajemen proyek. Pengendalian biaya yang kurang baik%2C tidak jarang menyebabkan biaya konstruksi proyek yang berbeda dengan bia...
ver más
|
|
|
|
|
|
|
Ahmad Sumantri
Pág. 92 - 98
Sistim perletakan merupakan bagian penting dalam kostruksi jembatan. Jenis perletakan yang sering dipakai pada konstruksi jembatan adalah perletakan elastomer. Kesalahan dalam perhitungan perencanaan perletakan menimbulkan resiko keruntuhan pada kostruks...
ver más
|
|
|
|
|
|
|
Ahmad Sumantri
Pág. 92 - 98
Sistim perletakan merupakan bagian penting dalam kostruksi jembatan. Jenis perletakan yang sering dipakai pada konstruksi jembatan adalah perletakan elastomer. Kesalahan dalam perhitungan perencanaan perletakan menimbulkan resiko keruntuhan pada kostruks...
ver más
|
|
|
|
|
|
|
Windy Anisa Putri,Irwan Irwan,Melloukey Ardan
Pág. 37 - 45
Pengendalian proyek merupakan salah satu fungsi dari manajemen proyek yang sangat mempengaruhi hasil akhir proyek, pengendalian mempunyai tujuan utama meminimalisasi segala penyimpangan yang dapat terjadi selama proses berlangsungnya proyek. Program apli...
ver más
|
|
|
|