4   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Patrick Citra Limanto,Aldo Soenaidy,Thiyada Wareerit,Jingru Hu,Annelieke Michelle van Engelenhoven     Pág. 128 - 144
Hotel Sahid Montana is a 3 stars hotel. The hotel has facilities and resources that ready to go international. Team 07 knew about it, because team 07 had conducted several surveys about it. First, we search for information through Internet media. The inf... ver más

 
en línea
Chandra, H.P.,Limanto, S.     Pág. 46 - 53
Trust is the willingness to rely upon the actions of others, to be dependent upon them, and thus to be vulnerable to their actions. In housing construction, where contract is usually  awarded without tender, trust of the developer to the contractor ... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
Sentosa Limanto,Adi Sanjaya,Tirta Djusman Arief,Josep Buntoro     Pág. pp. 46 - 56
Material supply has a very important role in construction process. Material supply process require suitable and reliable supplier. In this study, fuzzy set theory is used as the appraisal and selection process of material suppliers to supply materials ne... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
Sentosa Limanto,Tirta Djusman Arief     Pág. pp. 25 - 29
Construction involves many activities. Every activity need a portion of time which is defined asduration. Duration is a statistic probabilistic variable, which is expressed in a range of values. So thetotal time required to complete a construction projec... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »