Yuqing Zhong, Xiaoxiang Zhang, Yanfei Yang and Minghui Xue
Mountainous cities face various land use challenges, including complex topography, low land use efficiency, and the insufficient control of land use in small-scale areas at the urban fringe. Considering population changes, environmental conservation, and...
ver más
|
|
|
|
|
|
|
Manuel Parente, António Gomes Correia, Paulo Cortez
Pág. 3601 - 3610
Earthworks are part of the construction of any type of ground transport infrastructure. In many road and railway infrastructures earthworks represent up to 30 to 50% of total cost of the construction. Moreover, earthworks involve the use of heavy mechani...
ver más
|
|
|
|
|
|
|
Fan Ding, Min Liu, Simon M. Hsiang, Peng Hu, Yuxiang Zhang and Kewang Jiang
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework bas...
ver más
|
|
|
|
|
|
|
Jianying Wei, Yuming Liu, Xiaochun Lu, Yu Feng and Yadi Wang
Tunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction projects ...
ver más
|
|
|
|
|
|
|
Haoling Ren, Yaping Zhao, Tianliang Lin and Jiangdong Wu
The proposed research can be used for simultaneous positioning and mapping of unmanned vehicles in complex engineering environments.
|
|
|
|
|
|
|
Shiqi Yue and Yuanwu Shi
With the rapid development of computer and artificial intelligence technology, robots have been widely used in assembly, sorting, and other work scenarios, gradually changing the human-oriented mechanical assembly line working mode. Traditional robot con...
ver más
|
|
|
|
|
|
|
Ze Yu, Chuxin Wang, Yuanyuan Zhao, Zhiyuan Hu and Yuanjie Tang
The linear scheduling method (LSM) for optimization in linear projects has been the focus of numerous academic studies over the years. However, research on incorporating reverse construction activities and other practical scenarios, such as flexible acti...
ver más
|
|
|
|
|
|
|
Ersen Huang, Hongjun Ke and Huanhuan Hu
In this paper, a fast construction method for a composite girder cable-stayed bridge is proposed. The method is used on the Xiangsizhou Bridge, and it complies with all bridge rules while reducing the entire construction time of the bridge by 4 months.
|
|
|
|
|
|
|
Claudia Garrido Martins, Susan M. Bogus and Vanessa Valentin
The construction industry has extensively applied the fast-tracking approach to the demanding need for the fast delivery of infrastructure projects. However, the fast-track strategy might be threatened by distinctive risks or changes in risk characterist...
ver más
|
|
|
|
|
|
|
Sensen Song, Shuguang Li, Yanling Liang, Runke Huo, Zhanping Song, Zizhen Miao and Ziyi Song
During the excavation process of a large-span variable cross-section of a tunnel, the deformation and stress characteristics of the surrounding rock supporting the structure are complex, and construction control is difficult. Based on an actual tunnel pr...
ver más
|
|
|
|
|
|
|
Shuo Wang, Kailun Feng and Yaowu Wang
In construction planning, decision making has a great impact on final project performance. Hence, it is essential for project managers to assess the construction planning and make informed decisions. However, disproportionately large uncertainties occur ...
ver más
|
|
|
|
|
|
|
Mona Salah, Rana Khallaf, Emad Elbeltagi and Hossam Wefki
Construction site layout planning (CSLP) is the strategic arrangement and planning of construction site spaces, which has an enormous impact on the success of any construction project. Over the past two decades, multiple planning models have been develop...
ver más
|
|
|
|
|
|
|
Shuai Yang, Rui Ren and Ya-Qiong Wang
In tunnel construction, the difficulty of ventilation gradually increases with the increase of ventilation distance, which endangers construction safety and delays construction progress. This paper presents an air cabin ventilation system of the tunnel d...
ver más
|
|
|
|
|
|
|
Enrique Aldao, Luis M. González-deSantos, Humberto Michinel and Higinio González-Jorge
In this work, a real-time collision avoidance algorithm was presented for autonomous navigation in the presence of fixed and moving obstacles in building environments. The current implementation is designed for autonomous navigation between waypoints of ...
ver más
|
|
|
|
|
|
|
Yidong Chen, Chen Li and Zhonghua Lu
In this paper, we propose a parallel algorithm for a fund of fund (FOF) optimization model. Based on the structure of objective function, we create an augmented Lagrangian function and separate the quadratic term from the nonlinear term by the alternate ...
ver más
|
|
|
|
|
|
|
Abdulkareem Alanazi, Khalid Al-Gahtani and Abdullah Alsugair
Despite advancing Internet of Things (IoT) technologies, road projects often rely on inaccurate supplier data, making it difficult to determine the cost, quantity, quality, and transportation duration of the needed materials. The wrong choice of material...
ver más
|
|
|
|
|
|
|
Serges Mendomo Meye, Guowei Li, Zhenzhong Shen and Jingbin Zhang
Along with the increased use of water resources, some large water conservancy projects began construction to address power supply shortages and control flooding and drainage. As investment grows, construction cycles lengthen, external environmental impac...
ver más
|
|
|
|
|
|
|
Sara Ebrahimi, Aminah Robinson Fayek and Vuppuluri Sumati
|
|
|
|
|
|
|
Hosang Hyun, Moonseo Park, Dowan Lee and Jeonghoon Lee
Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures...
ver más
|
|
|
|
|
|
|
Cemil Akcay, Setenay Isikyildiz
Pág. 335 - 346
|
|
|
|