613   Artículos

« Anterior     Página: 1 de 31     Siguiente »

 
en línea
Haneul Lee and Seokheon Yun    
Accurately predicting construction costs during the initial planning stages is crucial for the successful completion of construction projects. Recent advancements have introduced various machine learning-based methods to enhance cost estimation precision... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Vivek Sharma, Carlos H. Caldas, Dhaval Gajjar and Prajakta Bapat    
Healthcare facilities (HCFs) are complex building structures that are becoming more challenging with ever-changing codes and regulations. Previously completed projects become a basis for future guidance regarding costs and scope. A robust normalization f... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Yihan Guan and Ka-Shing Cheung    
While construction costs and housing prices are implicitly examined in the construction economics literature, dedicated studies on their theoretical underpinning are rare. In this study, we investigated the application of different pricing theories in Au... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Abdulah M. Alsugair, Naif M. Alsanabani and Khalid S. Al-Gahtani    
Raising the final contract cost (FCC) is a significant risk for project owners. This study hypothesizes that the factors that cause owner?s cost estimation (OCE) accuracy and FCC changes share the same causes, and a case study confirmed that the two vari... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Alireza Bahrami, Jonas Jakobsson and Tobias Söderroos    
Construction of buildings with wooden frames higher than two stories has been permitted in Sweden since 1994. As construction of multi-story buildings with wooden frames is relatively new, people in the construction industry are more likely to construct ... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Suleiman Abu Kharmeh, Emad Natsheh, Batoul Sulaiman, Mohammad Abuabiah and Saed Tarapiah    
Datasets used for artificial-neural-network and machine-learning applications play a vital role in the research and application of such techniques in solving real-life problems. The construction and availability of large datasets to be used in the off-li... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Jingjing Wang, Ke Pan, Cong Wang, Wenxiang Liu, Jiajia Wei, Kun Guo and Zhansheng Liu    
Bridges are special infrastructures that emit large amounts of carbon dioxide from construction. Attention should be given to the carbon cost generated by the bridge, which includes its direct economic cost; the carbon cost is the largest driving force e... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Shengxian Tang, Hexu Liu, Manea Almatared, Osama Abudayyeh, Zhen Lei and Alvis Fong    
Construction-oriented quantity take-off (QTO) refers to the process of determining the quantities for construction items or work packages in accordance with their descriptions. However, the current construction-oriented QTO practice relies on estimators?... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Odey Alshboul, Ali Shehadeh, Ghassan Almasabha, Rabia Emhamed Al Mamlook and Ali Saeed Almuflih    
As a fundamental feature of green building cost forecasting, external support is crucial. However, minimal research efforts have been directed to developing practical models for determining the impact of external public and private support on green const... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Try Ramadhan, Beta Paramita and Ravi Shankar Srinivasan    
The strategic issue faced by the Ministry of Public Works and Housing, Republic of Indonesia (PUPR) is the large housing backlog, especially in the urban areas. Low-income communities earning less than 2 USD/day are found as the most vulnerable to lack o... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Tomá? Hanák, Adriana Drozdová and Ivan Marovic    
A contractor?s ability to prepare a competitive bid for a construction tender is crucial for its survival on the market. The bid price estimation strategy should promote the probability of winning a sufficient amount of tenders but, at the same time, ens... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Rongbo Hu, Kepa Iturralde, Thomas Linner, Charlie Zhao, Wen Pan, Alessandro Pracucci and Thomas Bock    
Single-task construction robots (STCRs) have become a popular research topic for decades. However, there is still a gap in the ubiquitous application of STCRs for onsite construction due to various reasons, such as cost concerns. Therefore, cost?benefit ... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
James Ellis, David John Edwards, Wellington Didibhuku Thwala, Obuks Ejohwomu, Ernest Effah Ameyaw and Mark Shelbourn    
This research explores the failure of competitively tendered projects in the UK construction industry to procure the most suited contractor(s) to conduct the works. Such work may have equal relevance for other developed nations globally. This research se... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Michal Juszczyk    
The completion of a bridge construction project within budget is one of the project?s key factors of success. This prerequisite is more likely to be achieved if the cost estimates, especially those provided in the early stage of a project, are realistic ... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Jaroslaw Konior and Mariusz Szóstak    
One of the key tasks of an investor and a contractor at the stage of planning and implementing construction works is to measure the progress of execution with regard to the planned deadlines and costs. During the execution of construction works, the actu... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Mohammadreza Habibi, Sharareh Kermanshachi and Behzad Rouhanizadeh    
Delay and cost overrun in construction projects are two widespread problems that arouse practitioners? and scholars? concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Mohammad Lemar Zalmai,Cemil Akcay,Ekrem Manisali     Pág. 226 - 237
In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources ar... ver más
Revista: Revista de la Construcción    Formato: Electrónico

 
en línea
Hatice Acar Yildirim,Cemil Akcay     Pág. 554 - 567
DOI: 10.7764/RDLC.18.3.554Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various ... ver más
Revista: Revista de la Construcción    Formato: Electrónico

 
en línea
Recently, the European Union set new rules for the Energy Performance of Buildings emphasizing the need to facilitate the cost-effective renovation of existing buildings into nearly zero-energy buildings (nZEB). Within this framework, the aim of this pap... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Zaigham Ali, Fangwei Zhu and Shahid Hussain    
Like other kinds of projects, construction projects are exposed to uncertainty, which plays a critical role in determining the transaction cost (TC). This study explores the uncertainty factors that are associated with construction projects that substant... ver más
Revista: ISPRS International Journal of Geo-Information    Formato: Electrónico

« Anterior     Página: 1 de 31     Siguiente »