6   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Guojun Xie, Jiquan Shen and Huanhuan Yang    
With the development and popularization of cloud storage technology, cloud storage has become a main method of data storage. Aiming at the problem of large delay and low availability incurred by multiple invalid nodes in cloud storage, a new type of conc... ver más
Revista: Information    Formato: Electrónico

 
en línea
Davide Forcellini    
The concept of seismic resilience has been introduced in the design of buildings in the last decade. In this regard, the delay time may be defined as the time that occurs between the event and the moment the repair process begins. In the literature, only... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
A. V. Bilchenko,A. H. Kyslov     Pág. 32 - 35
 The features of operation of bridge structures as parts of urban transport-and-municipal infrastructure are presented. A strategy for repair of city bridges associated with the change or delay in transportation routes and pedestrian traff... ver más
Revista: Nauka ta Progres Transportu    Formato: Electrónico

 
en línea
Shichang Xiao, Jinshan Huang, Hongtao Hu and Yuxin Gu    
Automatic guided vehicles (AGVs) in the horizontal area play a crucial role in determining the operational efficiency of automated container terminals (ACTs). To improve the operational efficiency of an ACT, it is essential to decrease the impact of batt... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

 
en línea
He Liu, Qidong Feng, Yanhai Yang, Jingyi Zhang, Jian Zhang and Guangchao Duan    
To increase performance and save costs when utilizing magnesium phosphate cements (MPC) to repair a damaged building structure or a cement pavement, MPC is typically combined with fly ash (FA) and metakaolin (MK). The influence of FA and MK on the workab... ver más
Revista: Coatings    Formato: Electrónico

 
en línea
Min Tang, Bin Ji, Xiaoping Fang and Samson S. Yu    
The continuous berth allocation and quay crane assignment problem considers the size of berths and ships, the number of quay cranes, the dynamic ships and non-crossing constraints of quay cranes. In this work, a mixed-integer linear programming model of ... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »