8   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Ahmed Yousry Akal    
Readability is an important aspect that each sub-contracting?s tender documentation should have in order to ensure commonality in the interpretation of its terms by the general contractor and sub-contractor. Otherwise, their contractual relationship is f... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa     Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe... ver más
Revista: Journal of Civil Engineering; Building and Trasportation    Formato: Electrónico

 
en línea
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa     Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe... ver más
Revista: Journal of Civil Engineering; Building and Trasportation    Formato: Electrónico

 
en línea
Bayu Puji Nugroho     Pág. 68 - 77
Risk is a situation that is uncertain and there is an element of danger, the consequences that could occur due to a process that is ongoing or upcoming events. One of them in construction, where activity in this activity, there is some risk that may occu... ver más

 
en línea
Karl-Friedrich Ackermann    
AbstractAn experiment on the value of the case study method was carried out at the University of Stuttgart in the Federal Republic of Germany, to ascertain whether the case study method was superior to the traditional teaching methods, especially with a ... ver más
Revista: South African Journal of Business Management    Formato: Electrónico

 
en línea
Karl-Friedrich Ackermann    
AbstractAn experiment on the value of the case study method was carried out at the University of Stuttgart in the Federal Republic of Germany, to ascertain whether the case study method was superior to the traditional teaching methods, especially with a ... ver más
Revista: South African Journal of Business Management    Formato: Electrónico

 
en línea
Edoghogho Ogbeifun     Pág. 82 - 91
The decline in apprenticeship in both the public and private sectors, the increasing use of sub-contractors as well as the uncoordinated approach in the informal sector are contributing factors to the shortage of skilled artisans in the construction indu... ver más

 
en línea
Edoghogho Ogbeifun     Pág. 82 - 91
The decline in apprenticeship in both the public and private sectors, the increasing use of sub-contractors as well as the uncoordinated approach in the informal sector are contributing factors to the shortage of skilled artisans in the construction indu... ver más
Revista: Construction Economics and Building    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »