|
|
|
Eugenia Rosalie,Novi S. Budiarso
Pág. 81 - 91
Uniformity in the preparation of a financial report needs to be done to get the results of a financial report is good and trustworthy. For that every company needs to implement the applicable accounting standardization in order to create information that...
ver más
|
|
|
|
|
|
|
Naofumi Fujishiro, Yasuhiro Otaki and Shoji Kawachi
In this study, we developed a similar text retrieval system using Sentence-BERT (SBERT) for our database of closed medical malpractice claims and investigated its retrieval accuracy. We assigned each case in the database a short Japanese summary of the a...
ver más
|
|
|
|
|
|
|
Kyong Ju Kim, Bonghee Han, Min Seo Park, Kyoungmin Kim and Eu Wang Kim
Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques...
ver más
|
|
|
|
|
|
|
Simone Blanc, Valentina Maria Merlino, Alice Versino, Giulia Mastromonaco, Antonina Sparacino, Stefano Massaglia and Danielle Borra
Background: This research investigates the web-based communication and promotion strategies applied by a sample of selected chocolatiers in Piedmont, a region in the northwest of Italy known for its ancient chocolate-making tradition. Methods: the AGIL s...
ver más
|
|
|
|
|
|
|
Ukpong Mfon Sampson
Pág. 9 - 17
This study is an investigation into the relationship between premiums received and claims paid in the Nigerian insurance industry over the period 2000-2017. Data on gross premiums received and gross claims paid over the period were gotten from the Centra...
ver más
|
|
|
|
|
|
|
Antonius W. Djojopranoto,Brad L. Benhart
Pág. 7 - 13
Design-build (DB) is a project delivery that has already been used widely in USA, UK, Singapore and in other countries. However, it is not widely used in Indonesia and there are limited studies available on DB. The purpose of this paper is to quantify pr...
ver más
|
|
|
|
|
|
|
Geir Torgersen, Jan Ketil Rød, Knut Kvaal, Jarle T. Bjerkholt and Oddvar G. Lindholm
Urban flooding caused by heavy rainfall is expected to increase in the future. The main purpose of this study was to investigate the variables characterizing the placement of a house, which seem to have an impact when it comes to the exposure to floods. ...
ver más
|
|
|
|
|
|
|
Geir Torgersen, Jan Ketil Rød, Knut Kvaal, Jarle T. Bjerkholt, Oddvar G. Lindholm
Pág. 1 - 13
Urban flooding caused by heavy rainfall is expected to increase in the future. The main purpose of this study was to investigate the variables characterizing the placement of a house, which seem to have an impact when it comes to the exposure to floods. ...
ver más
|
|
|
|
|
|
|
Ramón Casillas, Helena Gómez-Adorno, Victor Lomas-Barrie and Orlando Ramos-Flores
We present a neural network architecture focused on verifying facts against evidence found in a knowledge base. The architecture can perform relevance evaluation and claim verification, parts of a well-known three-stage method of fact-checking. We fine-t...
ver más
|
|
|
|
|
|
|
Sunday Stephen Ajemunigbohun,Ogochunkwu Augustine Isimoya,Pretoria Moun Ipigansi
Pág. 103 - 116
This study examines insurance claims fraud in homeowner?s insurance with its empirical findings from the Nigerian insurance industry. In this study, a descriptive research design was employed while purposive sampling method was adopted for information se...
ver más
|
|
|
|
|
|
|
Mohamad Kassem
Pág. 124 - 126
Jason, D. 2015. Claims Disputes and Litigation Involving BIM. Devon, UK: Routledge. ISBN: 978-0-415-85894-6. 208 pages.
|
|
|
|
|
|
|
João Miguel Oliveira Cotrim, Francisco Nunes
Pág. 306 - 338
s-
|
|
|
|
|
|
|
Mohamad Kassem
Pág. 124 - 126
Jason, D. 2015. Claims Disputes and Litigation Involving BIM. Devon, UK: Routledge. ISBN: 978-0-415-85894-6. 208 pages.
|
|
|
|
|
|
|
Saud Alshammari, Khalid Al-Gahtani, Ibrahim Alhammad and Nuhu Braimah
|
|
|
|
|
|
|
|
Nitin Balkrishna Chaphalkar, K. C. Iyer
Pág. 32 - 44
Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, wh...
ver más
|
|
|
|
|
|
|
Prue Vines
Pág. 133 - 134
Philip Davenport and Helen Durham, 2013, Federation Press, 3rd ed, ppi-xiv, 1-338, index, case table, legislation table, glossary of terms, ISBN978-1-86287-912-6, Price AUD85.00
|
|
|
|
|
|
|
Nitin Balkrishna Chaphalkar, K. C. Iyer
Pág. 32 - 44
Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, wh...
ver más
|
|
|
|
|
|
|
Prue Vines
Pág. 133 - 134
Philip Davenport and Helen Durham, 2013, Federation Press, 3rd ed, ppi-xiv, 1-338, index, case table, legislation table, glossary of terms, ISBN978-1-86287-912-6, Price AUD85.00
|
|
|
|
|