David Eduardo Morocho Jaramillo, Camilla Mileto and Fernando Vegas López-Manzanares
This article explores the ties between vernacular architecture, culture and identity in a context of sociocultural change in the Ecuadorian Amazon. The text addresses the loss of a collective cultural identity from a historical, socio-spatial and descrip...
ver más
|
|
|
|
|
|
|
Rami A. Bahamid, Shu Ing Doh, Muhamad Azry Khoiry, Mukhtar A. Kassem and Mohammed A. Al-Sharafi
Construction is a critical sector of any economy in terms of value production, labor, and contributing to the gross national product. Managing risk is a relatively young area in Yemen?s construction sector, but it is gaining traction as building activity...
ver más
|
|
|
|
|
|
|
Khairul Fikri Khairudn,Nurul Hamiruddin Salleh,Srazali Aripin
Pág. 255 - 264
Rumah Kutai in Perak is amongst the oldest surviving traditional Malay house and is gradually disappearing from the indigenous cultural landscape of Malaysia. Therefore, it is crucial to preserve such precious Malay heritage especially on the unique cons...
ver más
|
|
|
|
|
|
|
Fatih Yazicioglu
Pág. 155 - 167
The Bosporus is a unique place with its traditional architecture. The construction of new buildings along the Bosporus coast line are forbidden and only reconstructions of demolished original historic buildings are possible. Since 1984 legal authorities ...
ver más
|
|
|
|
|
|
|
Daniel Díaz, Carlos Videla
Pág. Page 133 - 146
The main objective ofthis paper is to document the Chilean experience on the application oj'the postensioned super fíat floors construction technology. The advantages of this solution are presented and compared with other types of slabs on grade, highlig...
ver más
|
|
|
|
|
|
|
|
Ibrahim Mahamid
Pág. 87 - 101
The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early sta...
ver más
|
|
|
|
|
|
|
Ibrahim Mahamid
Pág. 87 - 101
The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early sta...
ver más
|
|
|
|
|
|
|
João Couto and Armanda Couto
Deconstructing a building is the careful dismantling of that building so as to make possible the recovery of construction materials and components, promoting their reuse and recycling. However, deconstruction remains a rare procedure in Portugal. Using p...
ver más
|
|
|
|
|
|
|
V. I. Petrenko
Pág. 96 - 100
In the article the results of wide introduction of new technologies and technique in construction of difficult objects by the Kievmetrostroy are presented.
|
|
|
|
|
|
|
O. M. Havrysh,S. O. Yakovliev,M. V. Borenko,V. Ye. Humeniuk
Pág. 161 - 164
The article gives estimations of technical level of construction and restoration machinery, on the basis of which the methods of technical equipment of the Special State Transport Service and practical recommendations thereto have been developed.
|
|
|
|
|
|
|
Nabil Sawalhi, Adnan Enshassi
Pág. 1 - 8
The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventyth...
ver más
|
|
|
|
|
|
|
Nabil Sawalhi, Adnan Enshassi
Pág. 1 - 8
The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventyth...
ver más
|
|
|
|
|
|
|
Ahmed Nouh Meshref, Elsayed Abdelfattah Ahmed Elkasaby and Abdelazim Ibrahim
Despite the use of numerous new and advanced technologies in construction projects, the industry?s efficiency remains low. This business has faced significant challenges for a long time, such as non-value-added activities, also known as waste. Lean const...
ver más
|
|
|
|
|
|
|
Mughees Aslam, Zhili Gao, Gary Smith
Challenges exist across the three dimensions of construction sustainability (economic; social and environmental) due to low productivity, waste, safety, and environmental hazards attributed to existing construction management pra...
ver más
|
|
|
|
|
|
|
Mughees Aslam, Zhili Gao, Gary Smith
Challenges exist across the three dimensions of construction sustainability (economic; social and environmental) due to low productivity, waste, safety, and environmental hazards attributed to existing construction management pra...
ver más
|
|
|
|
|
|
|
Mughees Aslam, Zhili Gao, Gary Smith
Challenges exist across the three dimensions of construction sustainability (economic; social and environmental) due to low productivity, waste, safety, and environmental hazards attributed to existing construction management pra...
ver más
|
|
|
|
|
|
|
Sina Moradi and Piia Sormunen
The shortage of constructive philosophies, principles, techniques, and tools in construction project delivery and sustainability before the 1990s, together with the abundance of them after 2000, creates two different eras which are of prime importance. T...
ver más
|
|
|
|
|
|
|
Syed Mahmood, Salman Azhar, Irtishad Ahmad
Pág. Page 60 - 70
Construction is a highly risk-prone industry with not a very good track record of coping with risks. The participants in the industry, as a result, have been enduring the agonizing outcomes of failure in the form of unusual delays in project completion,...
ver más
|
|
|
|
|
|
|
Felipe Araya
Pág. 338 - 353
|
|
|
|