Resumen
The article is devoted to the possibility of replacement of complex inseparable irregular bridge structures by their regular counterparts, with minimal errors in definition of the own frequencies. The analysis has been performed on a real five-span bridge structure, designed under a 66 +126 +147 +115 + 76 ? meter scheme.