Redirigiendo al acceso original de articulo en 16 segundos...
Inicio  /  Nauka ta Progres Transportu  /  Núm: 11 Par: 0 (2006)  /  Artículo
ARTÍCULO
TITULO

DETERMINE THE REQUIRED QUANTITY OF SEMI TIME-TABLED TRAIN TO EXECUTE A GIVEN WORKLOAD MANEUVERING LOCOMOTIVES FOR PASSENGER STATION

B. Ye. Bondar    
Ya. V. Bolzhelarskyi    

Resumen

A calculation method of the number of shunting single trips for meeting the task volumes of shunting operations at a passenger station is developed. The computation of the single trips numbers is based on the train schedule and technological processes of the station and the car depot. The types of shunting single trips are analyzed, the required numbers of shunting single trips are calculated for specific shunting areas. The results of empirical trip are represented, which are in line with the results of computation.

PÁGINAS
pp. 112 - 115
MATERIAS
INFRAESTRUCTURA
REVISTAS SIMILARES

 Artículos similares