Resumen
Considered is the influence of such factors as technology of works production, organizational and technological schemes on the results: duration and cost of realization of construction projects. These factors are not adequately reflected in the existing traditional methodology of organizational and technological preparation and the effective normative documents. The estimations of cost and timeframe of construction project realization without account of these factors cannot be considered realistic.