RISK MANAGEMENT IN CONSTRUCTION OF DRY BULK JETTY AT TELUK LAMONG MULTIPURPOSE TERMINAL

Bayu Puji Nugroho    

Resumen

Risk is a situation that is uncertain and there is an element of danger, the consequences that could occur due to a process that is ongoing or upcoming events. One of them in construction, where activity in this activity, there is some risk that may occur and give a great impact in the success of the completion of the work. Approaches were made to the risks involved with understanding/identification of risk, risk measurement, risk mapping, the response to risk. So with the existence of such activities can provide a recommendation as to whether the risks are acceptable, divided, reduced or avoided. This research was conducted with descriptive quantitative research methods. The results of this study concluded that there were 7 risk factors in very high level understanding of contract documents i.e., different site condition, productivity, quality equipment/material quality, smooth cash flow, the competence of sub contractors, and the influence of the weather. Against the risk of handling very high i.e. by way of doing business ? business everything possible so that it can reduce the level of risk that exists so that the work can be resolved properly and the third project targets can be achieved.

PÁGINAS
pp. 68 - 77
MATERIAS
INFRAESTRUCTURA
REVISTAS SIMILARES

 Artículos similares